365 Tollway (Segments 1 & 2)

Expected Completion

2027

Investment

Ongoing

The Hidalgo County Regional Mobility Authority (HCRMA) is constructing the proposed 365 Tollway, a critical transportation project designed to enhance mobility, improve safety, and support international trade across the region. The project will construct a 12.2 mile controlled-access toll facility providing an alternate east–west route parallel to IH-2, including 13 interchanges, a floodway bridge levee relocations and frontage roads in select locations, aiming to reduce congestion and improving freight movement. Once complete, the SH 365 Tollway will connect key international ports of entry, including the Anzaldúas and Pharr-Reynosa International Bridges, and link with future projects such as the International Bridge Trade Corridor (IBTC) and 365 Tollway Phase III. This strategic investment will strengthen regional infrastructure, facilitate efficient cross-border commerce, and provide long-term economic benefits to Hidalgo County and the surrounding communities.

SH 365/US 281

Finding of No Significant Impact (FONSI) & ROW Release.

Access Documents

SH 365

SH 365 Final Environmental Assessment.

Access Documents

Construction Updates

SH 365 Sections and Plans of controlled-access corridor.

06/2015
Held Utility Kickoff Meetings.

07/ 2015
Obtained Environmental clearance.

12/2017
100% of ROW acquired

09/2017
100% PS&E Completed

10/2017
Received State Letter of Authority and FPAA

10/2021
Project Awarded

03/2022
Construction Commencement

Construction Progress

Final Schematics

SH 365 Sections and Plans of controlled-access corridor.

SH 365 from FM 1016

Conway Ave to McColl Road (SH 365 Segs. 2 & 4).

Access Documents

 SH 365 from McColl Rd to US 281

Military Highway (SH 365 Seg. 1).

Access Documents

 US 281

Military Highway from Spur 600 / Cage Blvd to FM 2557 / Stewart Rd (SH 365 Seg. 3)

Access Documents

BSIF Connector from
Spur 29 to US 281

Military Highway
(SH 365 Seg. 3)

Access Documents

Project Limits and Ramp Locations